High-rise renovation, 2019

Structural and technical optimization

AUKETT + HEESE Frankfurt was entrusted with the general management as well as general planning from the basic evaluation to the reporting within the client structure and with its systems.

The task comprised PM, TGA and architectural services for all phases, additionally measurement and as-built drawings, for the implementation of a package of seven measures in a high-rise office building with 2,300 employees.

This included 4,200 sqm of roof refurbishment, which could only be carried out using special site equipment such as a temporary roof-mounted crane (one of 2 available in Europe), which in turn had to be moved into position by a mobile crane. This was used to move approx. 1,200 to. of material in 7 months. material was moved, mainly the 8cm thick in-situ concrete layer, which was cut into 1/4 m² pieces for this purpose. Furthermore, relevant components of the cooling and electrical systems, such as a 2MW turbo compressor and all main roof refrigeration machines, were replaced, all while the building was in operation, as well as 4,000 sqm of floor coatings in the technical centres on the 1st and 18th floors – in more than 20 weekend shifts, each with only 4 hours of drying time, to ensure continuous maintenance access to all systems.

Location

Frankfurt am Main
Project Location Frankfurt am Main

Status

Completed

Gross floor area

4000 m²

Service phases

All Phases

Client

Confidential

Photography

MD

Location

Frankfurt am Main
Project Location Frankfurt am Main

Status

Completed

Gross floor area

4000 m²

Service phases

All Phases

Client

Confidential

Photography

MD

High-rise renovation

— Behind the Scenes

There was no more space for the construction site equipment. In 7 months, a total of 1,200 tonnes of material were moved here from a height of 120m using the Derrik crane.